You are not logged in
Login Here
          News Home
          Search News
          Add a News Article
          Manage your Article
          Help
          News Member Area
          Register as Member
 
          World News
          Local News & Events
          Business Listings
          Free Classified Ads
          Opinion Poll/Survey
          Prizes/Free
          Local Weather
   
Dufferin Street Bridge over rail corridor to be closed
Article Number: 475

 
Article Detail
Date
6/3/2013 6:16:01 PM
Written By
Article Rating
Views
790
 
 Print This Article
  
Article
May 31, 2013
Effective June 12, the City of Toronto will be closing the Dufferin Street Bridge to all vehicular traffic. The bridge will remain open for pedestrians and cyclists.

The Dufferin Street Bridge is south of Springhurst Avenue and goes over the GO Transit/Metrolinx Rail Corridor.

The purpose of the closure is to ensure public safety. The bridge was scheduled for replacement in 2016, but as a result of recent inspections, the City has made the decision to expedite the closure and replacement.

The reconstruction will include the installation of a temporary bridge in advance of the full reconstruction being completed. The temporary bridge will be open to vehicular traffic. More information about the opening of the temporary bridge will be available in late June.

Until the temporary bridge is completed, traffic management plans, including adjusted signal times, will be in place to help ease congestion.

Transmitted: 11/14/2024 9:26:19 PM
Driven By SpinMedia

 

 
 
 

Copyright 2003 Punjabi Media.  All Rights Reserved.  Designed, Hosted and Maintained by SpinMedia